
National Archives Chiller Replacement
Working with BECA and LT McGuinness prefabrication and installation were achieved.
Point cloud data was 3D scanned on site to allow drafting, approval and prefabrication to begin.
Installation was managed internally working with all key stakeholders to get the desired result for the client.